The site consisted initially of parkland and a small bowling club which was to be demolished and reconstructed to a higher specification,
including a split usage building for the bowling club itself, and the local authority maintenance store and mess for the park maintenance teams. A new café and amphitheatre was also constructed for the local residents to enjoy, along with sports pitches and facilities and an outside adventure playground. The final parts of the development consisted of an operations and electrical MCC building and a large control building over a 40m deep stormwater detention tank.
The existing water treatment works at Fleetwood WTW had no additional spare capacity and therefore Anchorsholme Park was development to include a new detention tank and outfall under the proposed new seawall and promenade for storm water disbursal.